Skip to content

US Dept of War Innovation Unit – Improved Mobile Electric Power Distribution System (I-MEPDIS)

Home / Funding Opportunity / US Dept of War Innovation Unit – Improved Mobile Electric Power Distribution System (I-MEPDIS)

US Dept of War Innovation Unit – Improved Mobile Electric Power Distribution System (I-MEPDIS)

twitterlinkedin

The US Marine Corps is looking to replace its aging and inefficient Mobile Electric Power Distribution System (MEPDIS) with a logistically supportable family of systems designed to meet the power demands of the future force.

This project seeks to develop and test a robust, scalable distribution system that seamlessly interconnects and distributes power from current tactical generators and energy storage systems. I-MEPDIS must support various sized military generators and electrical consumers. I-MEPDIS will distribute electric power to communications, mission command, fire control, combat operations centers, and force protection systems in expeditionary environments and other locations lacking a stable power grid.

The I-MEPDIS must be rapidly deployable and be backwards compatible with the current MEPDIS-Replacement system.

The goal is to modify and adapt existing commercial technologies for military use through a two-phased approach:

Phase 1 – 6 -12 months – Initial Design and Prototyping – Modify commercial systems to meet desired solution features, deliver initial prototypes, and conduct Military-Standard (MIL-STD) compliance testing.

Phase 2 – 1 – 3 months – User Evaluations – Conduct field evaluations with operational units to assess user feedback, system interoperability, and performance.

Technical Criteria

  • Power Inputs: Must accept 120V and 208V 3-phase(〜) Alternating Current (AC).
  • Power Outputs: Must distribute 120VAC, 208V 3-phase AC, and 28V Direct Current (DC).
  • Monitoring: Amperage monitoring is highly desired for all panels.
  • Form Factor (<200A): Systems with inputs rated below 200 Amps (A) must be person-portable.
  • Form Factor (>200A): Systems with inputs rated above 200 Amps must be skid-mounted and transportable via standard USMC Material Handling Equipment.
  • MIL-STD Compliance: All systems must meet MIL-STD-810 environmental testing requirements.

Submissions are due 28 October 2026.

 

Read more

You may be also interested in ...